White Papers
If you need more in-depth explanations of Robbins products, browse through our white papers. These downloadable and printable papers, written by Robbins employees, cover everything from disc cutter development to detailed TBM design on some of the largest tunneling projects in history.
- Challenges, Solutions, and Reality in TBMs for the English Channel Tunnels
- Shielded TBMs - Matching the Machine to the Job
- Development and Performance of Large Diameter Disc Cutters for use on High Performance TBMs
- Yindaruqin Irrigation Project: High Speed Tunneling in China
- Tunnel Boring Machines in Hong Kong
- Meraaker Hydro - Tunneling the "Norwegian Way"
- An Update on the Performance of Large Diameter (483 mm) Cutters and High Performance TBMs
- The Blue Mountains Sewerage Scheme: A Case History of the Hazelbrook to Katoomba Tunnels
- Main Bearings for Advanced TBMs
- High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3: A Design and Case History
- The Penetration Rate Baseline Dilemma.pdf
- Development of Cutterheads for the Kárahnjúkar Hydropower Project in Iceland
- Water Tunnel in Liaoning Province, Northeast China
- Niagara Tunnel Project