The Robbins Company: Reliable | Responsive
Language EN | 中文  
Close menu Close
Open menu Menu
Close menu Close
  • Acerca
    • Historia
    • Empleos
      • Oportunidades de Empleo Actuales - EEUU
    • Advancementos
      • OFTA
      • McNally Support System
      • Cutter Monitoring
      • TBMs in Mining
      • Difficult Ground Solutions
      • Equipment Life
  • Productos
    • TUNELADORAS
      • TUNELADORA ABIERTA
      • TBM DE DOBLE ESCUDO
      • ESCUDO SIMPLE
      • Crossover Machines
      • TUNELADORAS DE EQUILIBRIO DE PRESIÓN DEL TERRENO
      • SISTEMAS BACK-UP
    • CINTAS TRANSPORTADORAS
      • COMPONENTES DE CINTAS
      • CINTAS VERTICALES
      • CINTAS DE SUPERFICIE Y REPARTIDORAS
    • Cutters
    • TUNELADORAS DE PEQUEÑO DIÁMETRO
      • TUNELADORAS DE PEQUEÑO TAMAÑO
      • PERFORADORA DE PEQUEÑO DIÁMETRO MOTORIZADA
      • CABEZA DE ROCA
      • Remote Controlled SBU
    • MICROTUNELADORAS
  • Proyectos
    • Worldwide Projects
    • Current Projects
    • Epic Projects
  • Noticias y medios
    • Events
      • Past Events
      • Webinars
    • Videos
    • Blog
    • Press Releases
    • World Records
    • Brochures & Spec Sheets
    • White Papers
  • Contacto
    • Plantillas Para Consultas
      • TBM Inquiry Form
      • Conveyor Inquiry Form
      • SBU Inquiry Form
      • Cutter Inquiry Form
    • Robbins Worldwide
    • Contactos Empresa
Language EN | 中文  
Acerca
  • Historia
  • Empleos
    • Oportunidades de Empleo Actuales - EEUU
  • Advancementos
    • OFTA
    • McNally Support System
    • Cutter Monitoring
    • TBMs in Mining
    • Difficult Ground Solutions
    • Equipment Life
Productos
  • TUNELADORAS
    • TUNELADORA ABIERTA
    • TBM DE DOBLE ESCUDO
    • ESCUDO SIMPLE
    • Crossover Machines
    • TUNELADORAS DE EQUILIBRIO DE PRESIÓN DEL TERRENO
    • SISTEMAS BACK-UP
  • CINTAS TRANSPORTADORAS
    • COMPONENTES DE CINTAS
    • CINTAS VERTICALES
    • CINTAS DE SUPERFICIE Y REPARTIDORAS
  • Cutters
  • TUNELADORAS DE PEQUEÑO DIÁMETRO
    • TUNELADORAS DE PEQUEÑO TAMAÑO
    • PERFORADORA DE PEQUEÑO DIÁMETRO MOTORIZADA
    • CABEZA DE ROCA
    • Remote Controlled SBU
  • MICROTUNELADORAS
Proyectos
  • Worldwide Projects
  • Current Projects
  • Epic Projects
Noticias y medios
  • Events
    • Past Events
    • Webinars
  • Videos
  • Blog
  • Press Releases
  • World Records
  • Brochures & Spec Sheets
  • White Papers
Contacto
  • Plantillas Para Consultas
    • TBM Inquiry Form
    • Conveyor Inquiry Form
    • SBU Inquiry Form
    • Cutter Inquiry Form
  • Robbins Worldwide
  • Contactos Empresa

EPB TBM Detail

TUNELADORAS DE EQUILIBRIO DE PRESIÓN DEL TERRENO

  • TBMs
  • TUNELADORA ABIERTA
  • TBM DE DOBLE ESCUDO
  • ESCUDO SIMPLE
  • Crossover
  • EPB
  • Back-Up Systems
Robbins Company Logo

White Papers | 2 November 2026

Rebuild of a Veteran TBM for Maryland's Ellicott City North Tunnel

A veteran Main Beam Machine is boring Maryland’s 0.9 mi (1.5 km) long Ellicott City North Tunnel, a major flood mitigation project designed to protect the historic town from future flash floods. In this paper, the authors detail the rebuild process used [...]

 >

A veteran Main Beam Machine is boring Maryland’s 0.9 mi (1.5 km) long Ellicott City North Tunnel, a major flood mitigation project designed to protect the historic town from future flash floods. In this paper, the authors detail the rebuild process used [...]

 >

News | 1 March 2026

Robbins celebrates TBM acceptance for Ellicott City North Tunnel

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

 >

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

 >

News | 1 September 2025

Huge Robbins Slurry TBM breaks through in Hiroshima

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

 >

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

 >

News | 10 August 2025

Robbins TBMs break through at Delhi Metro DC-07 Project

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

 >

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

 >

Videos | 11 August 2024

Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

 >

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

 >

 
The Robbins Company: Reliable | Responsive

Aviso de Privacidad | Terms of Use | Technical Support | Log In | Site Map