The Robbins Company: Reliable | Responsive
Language EN | 中文  
Close menu Close
Open menu Menu
Close menu Close
  • О КОМПАНИИ
    • ИСТОРИЯ
    • свяжитесь с нами
      • ТЕКУЩИЕ ВАКАНСИИ – США
    • Advancements
      • OFTA
      • McNally Support System
      • Cutter Monitoring
      • TBMs in Mining
      • Difficult Ground Solutions
      • Equipment Life
  • НАША ПРОДУКЦИЯ
    • Tunnel Boring Machines
      • Main Beam
      • Double Shield
      • Single Shield
      • Crossover Machines
      • Earth Pressure Balance
      • Back-Up Systems
    • Conveyors
      • Conveyor Components
      • Vertical
      • Stacker / Overland
    • Cutters
    • Small Boring Machines
      • Small Boring Unit
      • Motorized Small Boring Unit
      • Rockhead
      • Remote Controlled SBU
  • НАШИ ОБЪЕКТЫ
    • Worldwide Projects
    • Current Projects
    • Epic Projects
  • News & Media
    • Events
      • Past Events
      • Webinars
    • Videos
    • Blog
    • Press Releases
    • World Records
    • Brochures & Spec Sheets
    • White Papers
  • КОНТАКТЫ
    • Robbins Worldwide
    • Company Contacts
    • ФОРМЫ ЗАПРОСА
      • TBM Inquiry Form
      • Conveyor Inquiry Form
      • SBU Inquiry Form
      • Cutter Inquiry Form
Language EN | 中文  
О КОМПАНИИ
  • ИСТОРИЯ
  • свяжитесь с нами
    • ТЕКУЩИЕ ВАКАНСИИ – США
  • Advancements
    • OFTA
    • McNally Support System
    • Cutter Monitoring
    • TBMs in Mining
    • Difficult Ground Solutions
    • Equipment Life
НАША ПРОДУКЦИЯ
  • Tunnel Boring Machines
    • Main Beam
    • Double Shield
    • Single Shield
    • Crossover Machines
    • Earth Pressure Balance
    • Back-Up Systems
  • Conveyors
    • Conveyor Components
    • Vertical
    • Stacker / Overland
  • Cutters
  • Small Boring Machines
    • Small Boring Unit
    • Motorized Small Boring Unit
    • Rockhead
    • Remote Controlled SBU
НАШИ ОБЪЕКТЫ
  • Worldwide Projects
  • Current Projects
  • Epic Projects
News & Media
  • Events
    • Past Events
    • Webinars
  • Videos
  • Blog
  • Press Releases
  • World Records
  • Brochures & Spec Sheets
  • White Papers
КОНТАКТЫ
  • Robbins Worldwide
  • Company Contacts
  • ФОРМЫ ЗАПРОСА
    • TBM Inquiry Form
    • Conveyor Inquiry Form
    • SBU Inquiry Form
    • Cutter Inquiry Form

Single Shield Detail

Single Shield

  • TBMs
  • Main Beam
  • Double Shield
  • Single Shield
  • Crossover
  • EPB
  • Back-Up Systems
Robbins Company Logo

White Papers | 3 June 2026

Cooperative Innovation at the Manhattan Tunnel Project: Digger Shields with Expandable Segments to Excavate Complex Fill

In this paper, the authors examine the cooperative structure that allowed the generation of a singular solution for the Manhattan tunnels, and the design of the digger shield machines and segments that are unique to the complexities of this urban infrastr [...]

 >

In this paper, the authors examine the cooperative structure that allowed the generation of a singular solution for the Manhattan tunnels, and the design of the digger shield machines and segments that are unique to the complexities of this urban infrastr [...]

 >

News | 1 March 2026

Robbins celebrates TBM acceptance for Ellicott City North Tunnel

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

 >

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

 >

News | 1 September 2025

Huge Robbins Slurry TBM breaks through in Hiroshima

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

 >

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

 >

News | 10 August 2025

Robbins TBMs break through at Delhi Metro DC-07 Project

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

 >

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

 >

White Papers | 15 August 2024

Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN

TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM was used to great effect. [...]

 >

TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM was used to great effect. [...]

 >

 
The Robbins Company: Reliable | Responsive

Privacy Policy | Terms of Use | Technical Support | Log In | Site Map