Excavating Rock Under 10 Bar Water Pressure
Robbins was the principal supplier of TBM technology for this project. They developed a new, hybrid-type machine concept to successfully manage the 10-bar water pressure anticipated in the worst sections of the tunnel. The project had been a dream for over 100 years, and was finally accomplished through a close collaboration between equipment manufacturers and the international consortium of contractors.
- Cooperative Innovation at the Manhattan Tunnel Project: Digger Shields with Expandable Segments to Excavate Complex Fill
- Robbins celebrates TBM acceptance for Ellicott City North Tunnel
- Huge Robbins Slurry TBM breaks through in Hiroshima
- Robbins TBMs break through at Delhi Metro DC-07 Project
- RETC 2025