The Robbins Company: Reliable | Responsive
Language EN | 中文  
Close menu Close
Open menu Menu
Close menu Close
  • About
    • History
    • Careers
    • Advancements
      • OFTA
      • McNally Support System
      • Cutter Monitoring
      • TBMs in Mining
      • Difficult Ground Solutions
      • Equipment Life
  • Products
    • Tunnel Boring Machines
      • Main Beam
      • Double Shield
      • Single Shield
      • Crossover Machines
      • Earth Pressure Balance
      • Back-Up Systems
    • Cutters
    • Small Boring Machines
      • Small Boring Unit
      • Motorized Small Boring Unit
      • Rockhead
      • Remote Controlled SBU
    • Mining Machines
      • Mine Development Machine
    • Conveyors
      • Conveyor Components
      • Vertical
      • Stacker / Overland
    • Parts & Service
      • Equipment Rental
      • Spare Parts
      • Field Personnel & Technical Assistance
  • Project Solutions
    • Worldwide Projects
    • Current Projects
    • Epic Projects
  • News & Media
    • Events
      • Past Events
      • Webinars
    • Videos
    • Blog
    • Press Releases
    • World Records
    • Brochures & Spec Sheets
    • White Papers
  • Contact
    • Inquiry Forms
      • TBM Inquiry Form
      • Conveyor Inquiry Form
      • SBU Inquiry Form
      • Cutter Inquiry Form
    • Robbins Worldwide
    • Company Contacts
Language EN | 中文  
About
  • History
  • Careers
  • Advancements
    • OFTA
    • McNally Support System
    • Cutter Monitoring
    • TBMs in Mining
    • Difficult Ground Solutions
    • Equipment Life
Products
  • Tunnel Boring Machines
    • Main Beam
    • Double Shield
    • Single Shield
    • Crossover Machines
    • Earth Pressure Balance
    • Back-Up Systems
  • Conveyors
    • Conveyor Components
    • Vertical
    • Stacker / Overland
  • Mining Machines
    • Mine Development Machine
  • Cutters
  • Small Boring Machines
    • Small Boring Unit
    • Motorized Small Boring Unit
    • Rockhead
    • Remote Controlled SBU
Project Solutions
  • Worldwide Projects
  • Current Projects
  • Epic Projects
News & Media
  • Events
    • Past Events
    • Webinars
  • Videos
  • Blog
  • Press Releases
  • World Records
  • Brochures & Spec Sheets
  • White Papers
Contact
  • Inquiry Forms
    • TBM Inquiry Form
    • Conveyor Inquiry Form
    • SBU Inquiry Form
    • Cutter Inquiry Form
  • Robbins Worldwide
  • Company Contacts

Single Shield Detail

Single Shield

  • TBMs
  • Main Beam
  • Double Shield
  • Single Shield
  • Crossover
  • EPB
  • Back-Up Systems
Robbins Company Logo

Featured News | August 17, 2024

Twin Robbins EPBs make milestones near Taj Mahal

A 6.52 m diameter Robbins EPB completed an intermediate breakthrough into SN Medical College Metro Station. The breakthrough was a significant achievement for the contractor, Afcons Infrastructure – Sam India Consortium, as the machine continues its bor [...]

more  >

A 6.52 m diameter Robbins EPB completed an intermediate breakthrough into SN Medical College Metro Station. The breakthrough was a significant achievement for the contractor, Afcons Infrastructure – Sam India Consortium, as the machine continues its bor [...]

more  >

Featured White Papers | August 15, 2024

Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN

TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM was used to great effect. [...]

more  >

TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM was used to great effect. [...]

more  >

Featured White Papers | August 15, 2024

Evaluating TBM Design and Performance, 30 Years Apart: The Lesotho Highlands Water Tunnel, Phase 1 and Phase 2

Two massive tunnel projects 30 years apart: The Lesotho Highlands Water Project (LHWP) is a multi-phased project that has taken place over decades to provide water to the Gauteng region of South Africa and to generate hydroelectricity for Lesotho. [...]

more  >

Two massive tunnel projects 30 years apart: The Lesotho Highlands Water Project (LHWP) is a multi-phased project that has taken place over decades to provide water to the Gauteng region of South Africa and to generate hydroelectricity for Lesotho. [...]

more  >

Featured Videos | August 11, 2024

Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

more  >

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

more  >

Featured News | June 18, 2024

Swift Robbins TBM breaks through 11 Months Early

A 6.4 m diameter Robbins Double Shield TBM broke through nearly one year early at Nepal’s Sunkoshi Marin Diversion Multipurpose Project (SMDMP) on May 8, 2024. [...]

more  >

A 6.4 m diameter Robbins Double Shield TBM broke through nearly one year early at Nepal’s Sunkoshi Marin Diversion Multipurpose Project (SMDMP) on May 8, 2024. [...]

more  >

 
The Robbins Company: Reliable | Responsive

Contact Us

Sign up for our newsletter

Privacy Policy | Terms of Use | Technical Support | Log In | Site Map