Next Generation Hybrid: The Crossover TBM
In 2015, the breakthrough of Robbins’ first Crossover TBM took place at Australia’s Grosvenor Coal Mine. The latest generation hybrid machine, made to cross between geologies that would normally require multiple TBMs, excavated variable ground 14 times faster than a roadheader. Since that initial project, dozens of Crossover machines have been used worldwide.
Recent Posts
- Cooperative Innovation at the Manhattan Tunnel Project: Digger Shields with Expandable Segments to Excavate Complex Fill
- Robbins celebrates TBM acceptance for Ellicott City North Tunnel
- Huge Robbins Slurry TBM breaks through in Hiroshima
- Robbins TBMs break through at Delhi Metro DC-07 Project
- RETC 2025