Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S.
The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-its-kind conversion process for the Main Beam TBM was undertaken 2.8 km into the bore and was not done inside a shaft or pre-excavated portal. This paper will detail the unique dual-diameter machine designed for the Mill Creek Drainage Relief Tunnel in Dallas, Texas, USA, machine performance, and successful size conversion process that took place in early 2021—a process that utilized the four C’s of construction to enormous benefit: Communication, Cooperation, Collaboration and Coordination.
Recent Posts
- Record-Setting Large Diameter Mixed Ground Tunneling in Turkey: The Eşme-Salihli Railway Tunnel
- Lessons Learned During Excavation of the Incredibly Challenging Yin Han Ji Wei Water Diversion Tunnel
- Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel
- Enhanced Probe Drilling & Pre-Grouting on Hard Rock TBMs
- A Clean Solution for Renewable Energy: Small Diameter Hydro Tunnels