The Robbins Company: Reliable | Responsive
Language EN | 中文  
Close menu Close
Open menu Menu
Close menu Close
  • About
    • History
    • Careers
    • Advancements
      • OFTA
      • McNally Support System
      • Cutter Monitoring
      • TBMs in Mining
      • Difficult Ground Solutions
      • Equipment Life
  • Products
    • Tunnel Boring Machines
      • Main Beam
      • Double Shield
      • Single Shield
      • Crossover Machines
      • Earth Pressure Balance
      • Back-Up Systems
    • Cutters
    • Small Boring Machines
      • Small Boring Unit
      • Motorized Small Boring Unit
      • Rockhead
      • Remote Controlled SBU
    • Mining Machines
      • Mine Development Machine
    • Conveyors
      • Conveyor Components
      • Vertical
      • Stacker / Overland
    • Parts & Service
      • Equipment Rental
      • Spare Parts
      • Field Personnel & Technical Assistance
  • Project Solutions
    • Worldwide Projects
    • Current Projects
    • Epic Projects
  • News & Media
    • Events
      • Past Events
      • Webinars
    • Videos
    • Blog
    • Press Releases
    • World Records
    • Brochures & Spec Sheets
    • White Papers
  • Contact
    • Inquiry Forms
      • TBM Inquiry Form
      • Conveyor Inquiry Form
      • SBU Inquiry Form
      • Cutter Inquiry Form
    • Robbins Worldwide
    • Company Contacts
Language EN | 中文  
About
  • History
  • Careers
  • Advancements
    • OFTA
    • McNally Support System
    • Cutter Monitoring
    • TBMs in Mining
    • Difficult Ground Solutions
    • Equipment Life
Products
  • Tunnel Boring Machines
    • Main Beam
    • Double Shield
    • Single Shield
    • Crossover Machines
    • Earth Pressure Balance
    • Back-Up Systems
  • Conveyors
    • Conveyor Components
    • Vertical
    • Stacker / Overland
  • Mining Machines
    • Mine Development Machine
  • Cutters
  • Small Boring Machines
    • Small Boring Unit
    • Motorized Small Boring Unit
    • Rockhead
    • Remote Controlled SBU
Project Solutions
  • Worldwide Projects
  • Current Projects
  • Epic Projects
News & Media
  • Events
    • Past Events
    • Webinars
  • Videos
  • Blog
  • Press Releases
  • World Records
  • Brochures & Spec Sheets
  • White Papers
Contact
  • Inquiry Forms
    • TBM Inquiry Form
    • Conveyor Inquiry Form
    • SBU Inquiry Form
    • Cutter Inquiry Form
  • Robbins Worldwide
  • Company Contacts

EPB TBM Detail

Earth Pressure Balance

  • TBMs
  • Main Beam
  • Double Shield
  • Single Shield
  • Crossover
  • EPB
  • Back-Up Systems
Robbins Company Logo

Featured News | September 6, 2023

Robbins Double Shield Sets Record in Nepal

At the end of June 2023, the machine turned in an impressive advance rate of 1,224.13 m in one month – a record for Himalayan geology and believed to be a TBM record within the Indian Subcontinent. [...]

more  >

At the end of June 2023, the machine turned in an impressive advance rate of 1,224.13 m in one month – a record for Himalayan geology and believed to be a TBM record within the Indian Subcontinent. [...]

more  >

Featured White Papers | June 21, 2023

Enhanced Probe Drilling & Pre-Grouting on Hard Rock TBMs

The incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstable ground can be resolved before becoming a problem through the use of enhanced, 360-degree probe drilling setups. [...]

more  >

The incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstable ground can be resolved before becoming a problem through the use of enhanced, 360-degree probe drilling setups. [...]

more  >

Featured Blog | June 1, 2023

Tunneling in Turkey: The Esme Salihli Railway

Large diameter tunneling in mixed ground has historically been seen as a challenge, but a recently completed tunnel in Turkey has changed the conversation. [...]

more  >

Large diameter tunneling in mixed ground has historically been seen as a challenge, but a recently completed tunnel in Turkey has changed the conversation. [...]

more  >

Featured Videos | August 22, 2022

Unprecedented Diameter Change: The Mill Creek Tunnel

At the Mill Creek Drainage Relief Tunnel in Dallas, Texas, USA, a Robbins Main Beam TBM underwent an in-tunnel diameter change for the first time in the industry. The machine went from 11.6 m diameter to 9.9 m diameter through teamwork, perseverance, and [...]

more  >

At the Mill Creek Drainage Relief Tunnel in Dallas, Texas, USA, a Robbins Main Beam TBM underwent an in-tunnel diameter change for the first time in the industry. The machine went from 11.6 m diameter to 9.9 m diameter through teamwork, perseverance, and [...]

more  >

Featured Brochures & Spec Sheets | October 24, 2021

MDM5000 Brochure

Find out more about Robbins' innovative solution for underground mining, the MDM5000 (standing for Mine Development Machine with dimensions of 4.5 m x 5.0 m). [...]

more  >

Find out more about Robbins' innovative solution for underground mining, the MDM5000 (standing for Mine Development Machine with dimensions of 4.5 m x 5.0 m). [...]

more  >

 
The Robbins Company: Reliable | Responsive

Contact Us

Sign up for our newsletter

Privacy Policy | Terms of Use | Technical Support | Log In | Site Map