The Robbins Company: Reliable | Responsive
Language EN | 中文  
Close menu Close
Open menu Menu
Close menu Close
  • About
    • History
    • Careers
    • Advancements
      • OFTA
      • McNally Support System
      • Cutter Monitoring
      • TBMs in Mining
      • Difficult Ground Solutions
      • Equipment Life
  • Products
    • Tunnel Boring Machines
      • Main Beam
      • Double Shield
      • Single Shield
      • Crossover Machines
      • Earth Pressure Balance
      • Back-Up Systems
    • Cutters
    • Small Boring Machines
      • Small Boring Unit
      • Motorized Small Boring Unit
      • Rockhead
      • Remote Controlled SBU
    • Mining Machines
      • Mine Development Machine
    • Conveyors
      • Conveyor Components
      • Vertical
      • Stacker / Overland
    • Parts & Service
      • Equipment Rental
      • Spare Parts
      • Field Personnel & Technical Assistance
  • Project Solutions
    • Worldwide Projects
    • Current Projects
    • Epic Projects
  • News & Media
    • Events
      • Past Events
      • Webinars
    • Videos
    • Blog
    • Press Releases
    • World Records
    • Brochures & Spec Sheets
    • White Papers
  • Contact
    • Inquiry Forms
      • TBM Inquiry Form
      • Conveyor Inquiry Form
      • SBU Inquiry Form
      • Cutter Inquiry Form
    • Robbins Worldwide
    • Company Contacts
Language EN | 中文  
About
  • History
  • Careers
  • Advancements
    • OFTA
    • McNally Support System
    • Cutter Monitoring
    • TBMs in Mining
    • Difficult Ground Solutions
    • Equipment Life
Products
  • Tunnel Boring Machines
    • Main Beam
    • Double Shield
    • Single Shield
    • Crossover Machines
    • Earth Pressure Balance
    • Back-Up Systems
  • Conveyors
    • Conveyor Components
    • Vertical
    • Stacker / Overland
  • Mining Machines
    • Mine Development Machine
  • Cutters
  • Small Boring Machines
    • Small Boring Unit
    • Motorized Small Boring Unit
    • Rockhead
    • Remote Controlled SBU
Project Solutions
  • Worldwide Projects
  • Current Projects
  • Epic Projects
News & Media
  • Events
    • Past Events
    • Webinars
  • Videos
  • Blog
  • Press Releases
  • World Records
  • Brochures & Spec Sheets
  • White Papers
Contact
  • Inquiry Forms
    • TBM Inquiry Form
    • Conveyor Inquiry Form
    • SBU Inquiry Form
    • Cutter Inquiry Form
  • Robbins Worldwide
  • Company Contacts

EPB TBM Detail

Earth Pressure Balance

  • TBMs
  • Main Beam
  • Double Shield
  • Single Shield
  • Crossover
  • EPB
  • Back-Up Systems
Robbins Company Logo

Featured White Papers | November 2, 2026

Rebuild of a Veteran TBM for Maryland's Ellicott City North Tunnel

A veteran Main Beam Machine is boring Maryland’s 0.9 mi (1.5 km) long Ellicott City North Tunnel, a major flood mitigation project designed to protect the historic town from future flash floods. In this paper, the authors detail the rebuild process used [...]

more  >

A veteran Main Beam Machine is boring Maryland’s 0.9 mi (1.5 km) long Ellicott City North Tunnel, a major flood mitigation project designed to protect the historic town from future flash floods. In this paper, the authors detail the rebuild process used [...]

more  >

Featured News | March 1, 2026

Robbins celebrates TBM acceptance for Ellicott City North Tunnel

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

more  >

A 5.6 m (18.4 ft) diameter Robbins TBM is set to excavate the 1.5 km (0.9 mi) long Ellicott City North Tunnel, a critical flood mitigation project in Howard County, Maryland, USA. [...]

more  >

Featured News | September 1, 2025

Huge Robbins Slurry TBM breaks through in Hiroshima

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

more  >

A mega-sized 13.67 m (44.87 ft) diameter Robbins Slurry machine broke through in Hiroshima, marking the completion of an excavation through challenging granitic rock at high water pressures. [...]

more  >

Featured News | August 10, 2025

Robbins TBMs break through at Delhi Metro DC-07 Project

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

more  >

Robbins proudly announces the successful breakthrough of two 6.65 m diameter Earth Pressure Balance (EPB) TBMs on India’s Delhi Metro Phase IV DC‑07 package. [...]

more  >

Featured Videos | August 11, 2024

Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

more  >

Learn more about the Sunkoshi Marin Diversion Multipurpose Project (SMDMP) in this in-depth video featuring a record-setting Robbins Double Shield TBM. Find out how the crew were able to bore through mountainous geology at an impressive 1,503.3 m in one [...]

more  >

 
The Robbins Company: Reliable | Responsive

Contact Us

Sign up for our newsletter

Privacy Policy | Terms of Use | Technical Support | Accessibility | Log In | Site Map