Experienced in Overcoming Adversity
From solutions for difficult ground to efficient TBM assembly at the jobsite, Robbins is ever advancing.
Recent Posts
- World Tunnel Congress 2024
- Use of a Tunnel Boring Machine on Nepal’s First and Second TBM-Driven Tunnels
- Robbins Double Shield Sets Record in Nepal
- Final Breakthrough at Bahçe-Nurdaği Railway
- Record-Setting Large Diameter Mixed Ground Tunneling in Turkey: The Eşme-Salihli Railway Tunnel