White Papers
Project Clear: Efficient Hard Rock Tunneling below St. Louis, Missouri
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting water quality and wastewater capacity throughout St. Louis, MO. The extensive program involves multiple tunnels, including Deer Creek, a 6.3 km long tunnel being bored with the largest TBM ever used in the St. Louis area (6.5 m in diameter). Another tunnel, Jefferson Barracks, is using TBM components that have bored over 40 km of tunnel since 1981.
Recent Posts
- A Clean Solution for Renewable Energy: Small Diameter Hydro Tunnels
- Non-Circular Tunnel Boring for Underground Mine Development
- Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S.
- Hard Rock Tunnel Boring at the Jefferson Barracks Tunnel
- The Next Generation of Mixed Ground Tunnel Boring Machines